1 Charlotte Road, London, EC2A 3DHTel: + 44 (0) 20 7613 4044info@fyfemcdade.com

Specifications

Apartment Interiors

  • Kahrs Engineered Flooring Linea Oak tide
  • Wide plank floorboards to hallway reception, kitchen and bedrooms of all units
  • Walls and ceilings are painted in a white vinyl matt mulsion. All joinery is primed and decorated with an egg shell oil finish
  • Internal doors in Vicaima white CPL with V Groove with modern brushed stainless steel handles
  • Front security fire resistant door continuous pressure laminate V groove

Kitchens

  • Soft close doors and drawers to handless kitchen units
  • Built in stainless steel Bosch appliances comprising electric oven, microwave & cooker hood (extractor) and electric ceramic hob
  • Indesit fully integrated fridge-freezer, dishwasher & washer dryer
  • Franke 1 & ½ bowl sink

Bedrooms

  • Master Bedrooms in all apartments have built in wardrobes other than where specified

Bathrooms & Shower

  • Wall mounted hand basin with vanity unit and chrome finish mixer tap
  • Mirror cabinet with shaver socket
  • White wall hung WC with chrome fittings/ soft closing seat
  • Steel bath including feet to bathrooms
  • 1000 x 800 mm square shower enclosure with sliding brushed steel frame and handle
  • Concealed horizontal thermostatic shower and bath chrome mixers with round rain shower head
  • Chrome thermostatically controlled towel rail
  • Neutral contemporary tiling to all wall and floors
  • Bath screen 1400mm x 800mm

Security

  • All apartments have video entry phones
  • Fully integrated smoke detection & fire alarm system

Heating and Lighting

  • Each apartment has under floor heating with individual zoned thermostats
  • Recessed contemporary white finish down lighters throughout
  • Generous supply of power points, telephone points TV/FM & sky plus television points

Sustainable Homes

  • Green Roof
  • Surface Water attenuation
  • Low energy rated appliances
  • Low energy lighting
  • Low water using appliances
  • Highly insulated
  • Achieving level 3 for the code of sustainable homes

Communal Areas

  • Hall stair and landing carpet with underlay and gripper to perimeter
  • Satin chrome finish ironmongery
  • Stainless steel handrail with glass balustrading

Building Standards

  • All elements of the development comply with building & fire regulations and relevant British standards

Warranty

  • All apartments are covered by a 10 year Premier Guarantee warranty against structural defects in construction

Lease

  • 125-year lease
MENU